Operational Risk Management and Business Continuity Planning for Modern State Treasuries
Author:
International Monetary Fund
Search for other papers by International Monetary Fund in
Current site
Google Scholar
Close

Contributor Notes

Author’s E-Mail Address: ian@storkeyandco.com

This technical note and manual addresses the following main issues: 1. What is operational risk management and how this should be applied to treasury operations. 2. What is business continuity and disaster recovery planning and why it is important for treasury operations? 3. How to develop and implement a business continuity and disaster recovery plan using a six practical-step process and how to have it imbedded into the day-to-day operations of the treasury. 4. What is needed to activate and what are the key procedures when activating the disaster recovery plan.

Abstract

This technical note and manual addresses the following main issues: 1. What is operational risk management and how this should be applied to treasury operations. 2. What is business continuity and disaster recovery planning and why it is important for treasury operations? 3. How to develop and implement a business continuity and disaster recovery plan using a six practical-step process and how to have it imbedded into the day-to-day operations of the treasury. 4. What is needed to activate and what are the key procedures when activating the disaster recovery plan.

Introduction

Management of financial risk is very important for the treasury operations of any ministry of finance. Ministry of finance bears responsibility for the management of very substantial government assets and liabilities, and for the management of many large value transactions, probably much more than any other government ministry or agency. The large sums involved mean that any risk exposure can have damaging financial consequences on the budget outturn and the overall government balance sheet. But there is potentially also severe reputational and political damage associated with operational errors or failures, reflecting on the competence of the ministry of finance covering treasury operations.

Ministry of finance is potentially exposed to—and will have a particular appetite for exposure to—a wide range of risks. Figure 1 illustrates the perceived risks:

  • financial risks: traditionally managed by a risk management unit located in the ministry of finance that includes market, liquidity, and credit risks

  • business risks: such as new legislation, change of government, macro-economic performance and any other factors affecting the ministry of finance’s environment—these are often managed as part of the budget planning process

  • operational risks: a range of threats from loss of key personnel, settlement failure, and compliance failure, to theft, systems failure and building damage—operational risk management aims to ensure the integrity and quality of the operations of ministry of finance and treasury using a variety of tools including audit, recruitment policies, system controls, and business continuity planning.

Figure 1:
Figure 1:

Perceived Treasury Risks

Citation: Technical Notes and Manuals 2011, 005; 10.5089/9781475504705.005.A001

Awareness of operational risk is low in many countries, and very few ministries of finance have a business continuity and disaster recovery plan (BCP/DRP). Often it is perceived as something applicable only to the private sector and attracts little attention by senior management. This is because it is not seen as important or a priority, there are inadequate resources allocated to establish and maintain an operational risk management (ORM) framework including BCP/DRP, responsibility is delegated to information technology, and it becomes a one-off project rather than an integral part of the day-to-day treasury operations. Management neglect is often at fault with the belief that “it won’t happen to me”.

The problem of course is that ORM covers a wide umbrella, often seen as covering everything except for market, liquidity, and credit risks. Unlike market or credit risk, operational risk is mainly endogenous to the ministry of finance. Apart from external events such as natural catastrophes, it is linked to the business environment, nature and complexity of treasury operations, the processes and systems in place, and the quality of the management and of the information flows. There is normally no regulatory pressure to put in place adequate measures to monitor and control operational risks and maintain a BCP/DRP as is the case with central banks.

In this paper, references to the ministry of finance (MoF) should be taken to include treasury operations (managed by the treasurer), notwithstanding that some countries have a separate treasury department or agency. A debt management unit (DMU) may also be part of ministry of finance or separately constituted (e.g. as a debt management office, DMO). The DMU or DMO may perform some of the treasury operations such as cash management, although these will often be shared with or in coordination with ministry of finance.

Introduction to Operational Risk Management

Definition

Under Basel II developed by the Bank for International Settlements (BIS)2, operational risk is defined as “the risk of loss resulting from inadequate or failed internal processes, people and systems or from external events.” The definition explicitly includes legal risk, but excludes strategic and reputation risk. While this definition and sound practices established by the Basel Committee on Banking Supervision and COSO, and usefully elaborated by entities such as TransConstellation, have been primarily designed for the banking and financial sector, the governing principles can appropriately be applied to treasury operations.3 What is necessary is an ORM framework that is appropriate to the range and nature of treasury operations and the operating environment.

For treasury, the categories of risks, such as market risk (exchange rate and interest rate risk), liquidity risk, and credit risk are relatively well known; however operational risk is not. Government treasurers are now beginning to understand operational risk management and the importance to their treasury. A summary of operational risks faced by the treasury is set out in Box 1. Business continuity planning should be an integral part of the ORM framework for treasury.

What is ORM?

The treasurer should be aware of the major aspects of operational risks as a distinct risk category that should be managed, and should approve and periodically review the operational risk management framework applicable to treasury. The framework should provide a definition of operational risk and lay down the principles of how operational risks are to be identified, assessed, monitored, and controlled or mitigated. A risk committee may be in place to oversee this. process.

Typical Treasury Operational Risks

  • Infrastructure and technology failures covering computer systems, power, telecommunications, data and physical records

  • Incidents where access to premises is denied, either through inaccessibility or building damage

  • Dependencies on third party key service providers such as the central and/or commercial banks, telecom and internet providers, and other outsourced operations, or resource failures from such incidents as a pandemic.

  • Human errors or failures through lack of resources, skills, training, policies, procedures, delegations, code of conduct, and poor management

  • Failure to meet statutory, legal or contractual, human resources and other obligations including management objectives and reporting obligations

  • Natural and regional disasters covering incidents such as earthquake, tsunami, severe flooding, hurricane/typhoon, volcanic eruption, severe fires, landslides and civil disturbance or terrorism

Senior management in treasury should have responsibility for implementing the ORM framework. The framework should be consistently implemented throughout all treasury operations, and all levels of staff should understand their responsibilities with respect to ORM. Senior management should also have responsibility for developing policies, processes and procedures for managing operational risk across all treasury activities, processes and systems. Senior management should also ensure that before new activities, processes, and systems are introduced or undertaken, the operational risks inherent in them is subject to adequate assessment and managed appropriately.

Treasury should implement a process to regularly monitor incidents that may cause a business disruption and/or have a serious impact on treasury operations. There should be regular reporting of pertinent information to the treasurer and senior executives in the ministry of finance. Treasury should have policies, processes, and procedures to control and/or mitigate the potentially more serious operational risks. Treasury should periodically review the ORM framework and should adjust their risk limitation and control strategies in the context of the government’s overall risk management strategy and objectives. Treasury should have in place a business continuity and disaster recovery plan to ensure its ability to operate on an ongoing basis and limit losses in the event of any business disruption.

Once an ORM framework is firmly established, treasury should consider using internal and/or external auditors to independently examine and assess the framework. Ideally, the auditors should from time to time independently conduct, directly or indirectly, an evaluation of treasury policies, procedures and practices related to operational risks.

Application of ORM to Treasury Operations

As noted in the introduction, operational risk is a wide umbrella, often seen as covering everything except for market, liquidity, and credit risks. Developing an ORM framework can be an evolutionary process as it will take time and effort to not only identify and understand the risks but also the mitigation techniques in an environment that is constantly changing. There is no need to try to do everything perfectly from the outset. The framework can be developed and applied incrementally as techniques improve and staffs in treasury increasingly get to understand the risks and mitigation techniques. For the framework to succeed, it is extremely important to develop a culture of risk awareness across treasury and ensure that all staff is involved in developing and implementing the framework.

The first stage involves senior management understanding and signaling to all staff the importance attached to ORM and the need for their participation and ongoing cooperation. The principles as outlined above that will be followed in the management of operational risk need to be made clear to all staff and embedded into day-to-day operations of treasury. Each line manager needs to be made responsible for ORM in their own business area.

It is advisable that a “risk champion” be appointed to take overall responsibility for ORM. The risk champion will lead and guide the process across treasury, coordinate reporting to the treasurer and senior management, and develop the appropriate ORM policies and procedures and control environment. Ideally, the risk champion would have relevant background or experience, although this will often not be possible. There are, however, opportunities for professional training in ORM and business continuity planning which could be considered.

Once the structure has been established, the development and maintenance of an ORM framework for treasury should follow a six-step process:4

  • understand and document business activities

  • identify, assess and measure risks

  • develop risk management strategies

  • implement risk management policies, limits and controls

  • monitor performance and compliance with policies, limits and controls

  • process for continuous improvement of the ORM framework.

Examples of the ORM process from the Ministry of Finance in Turkey and Chile are set out in Figure 25 and Box 2, respectively.

Figure 2:
Figure 2:

ORM Model for Turkey

Citation: Technical Notes and Manuals 2011, 005; 10.5089/9781475504705.005.A001

For treasury operations, service providers such as the central bank and commercial banks should demonstrate that they have adequate controls and safeguards when they host or process data related to banking systems. Treasury should discuss with the central bank and the commercial banks this requirement and suggest that they could use the International Standard on Assurance Engagements (ISAE) No.3402, Assurance Reports on Controls at a Service Organization, as it is a widely recognized auditing standard developed by the International Auditing and Assurance Standards Board (IAASB).6 A service auditor’s examination performed in accordance with ISAE 3402 is widely recognized, because it represents that a service organization has been through an in-depth audit of its control objectives and control activities, which often include controls over information technology and related processes. ISAE 3402 is the authoritative guidance that would allow the central and commercial banks to disclose their control activities and processes to treasury in a uniform reporting format.

The management of operational risk must be a responsibility shared and understood by all staff in treasury operations. Staff should be aware of the operational risk exposures in their area, and how they might affect business continuity, and have responsibility for managing those exposures within their own control. Senior managers should be responsible for identifying and monitoring the risks in their own units and for ensuring that the control activities work as intended and in line with priorities set by the treasurer. International experience has shown that for this all to work, ORM is more effective if a “risk champion” is appointed who is located in a risk management unit along with other risk management functions.

The risk management unit including risk champion has two roles. First, it drives the development of the risk management process, monitors performance and execution, and reports to the treasurer. Second, it acts as advisers to senior managers in identifying risks and planning control activities. In practice, the unit typically evolves over time, from being the main driver when first establishing the ORM framework including BCP/DRP, to being more of a facilitator or adviser when it is running smoothly.

Case of Chile: Outline of the Risk Management Process

The main objective is “to have an efficient internal control system and to comply with a Risk Management process structured, consistent and coordinated for effective and efficient achievement of institutional goals and objectives”.

Risk Management has the following objectives:

  • Identify risks and opportunities

  • Analyze the risks in the process

  • Assessing risks

  • Set the risk treatment

  • Monitor and review (feedback)

  • Construction of the risk matrix

Step 1: Risk Policy

  • Define roles and responsibilities of the process of risk management

  • Determine the key processes involved in improving the quality of service

  • Be communicated, published and consistent with the Quality of Service Policy

Step 2: Survey Process

  • Raise the processes developed by the Quality of Service Policy

  • Identify risks by type

Step 3: Development of the Matrix

  • Classification of transverse processes

  • Process and sub-process weights

  • Risk type

  • Justification of strategic weighting

Step 4: Establish Ranking

  • Ranking by the process set

  • Establish ranking by sub-process

Step 5: Establish Treatment Plan

  • Measures, timelines, responsibilities, potential impact (reduce, accept, avoid, sharing) and performance indicators, measurement period goal

Step 6: Monitoring and Review

  • Generating reports

  • Monitoring

  • Diagnosis and improvement proposals

Strategic Risk Matrix

article image

Business Continuity and Disaster Recovery Planning

Introducing Business Continuity and Disaster Recovery Planning

Business continuity management or planning is the development, implementation and maintenance of policies, frameworks and programs to assist treasury manage a business disruption, as well as build treasury resilience. Resilience comes from tackling the likelihood as well as the consequences of disruptive events. Therefore, it is important to have both effective ORM and business continuity planning frameworks in place. Business continuity planning assists in preventing, preparing for, responding to, managing, and recovering from the impacts of an incident or disruptive event.

Business continuity means maintaining the uninterrupted availability of all key business resources required to support essential treasury operations. Treasury’s business strategies and decisions are based on an assumption of the business continuing. An event that violates this assumption is a significant occurrence in the life of any treasury, impinging directly on its ability to fulfill its business objectives and the reputation of the treasury and the government. Among other things, business continuity planning is about putting in place measures that seek to prevent business interruption events from occurring in the first place. It also encompasses establishing appropriate responses should such an event occur.

Business continuity planning is therefore that part of ORM that establishes cost-effective measures should an event occur. As such, it deals with actual events—a risk event which has occurred—and the action required responding to the event. To this extent, it complements the overall ORM process which deals foremost with possibility of occurrence of risks events that may occur, and the analysis and pro-active management of such events. Treasury faces a variety of risks. These may be sourced externally, and therefore largely out of the immediate control of treasury, or internally. Internal risks arise both at the strategic (MoF-wide) level and at the operational (business process) level.

Business continuity planning should address the subset of operational risks where environmental factors or poor operational controls raise the potential for loss of or damage to treasury operations (including people, information, infrastructure, and premises). With the support of all staff, treasury should maintain a BCP/DRP that the government and external counterparties will view as sound practice, and which will play an important part in the overall approach to ORM. BCP/ DRP concentrates on improving resilience and ensuring mitigation techniques are put in place for those areas identified as having a combination of very-high/high probability and catastrophic/major. It is also advisable to cover incidents of lower probability that have a catastrophic/major impact. How these are defined is set out in the business impact analysis section below.

Treasury should select the most cost effective and suitable risk intervention approach for each activity using one or more of the following strategies:

  • prevention or avoidance, where the probability of an event occurring is reduced or eliminated by, for example, installing back-up power generators, using more than one telecom provider, training staff, and implementing fraud prevention policies and procedures

  • transference, where risks are passed to third parties by taking out insurance or outsourcing with BCP/DRP incorporated in service level agreements

  • containment, where the potential impact of an event occurring is limited in the early stages using controls or other techniques by implementing fraud detection policies and procedures, putting in place escalation procedures so that treasury management can respond immediately should an event begin to escalate, and having more than one person to perform a particular task or activity

  • acceptance and recovery, where an event or disruption might well occur but treasury operations can be resumed successfully using the disaster recovery plan that is regularly tested at the recovery location (alternate site)

While some strategies can be implemented at minimal cost, there will be a trade-off between the cost of prevention and/or recovery and the recovery period needed by the treasury. Therefore, a key element for treasury to consider is the cost-recovery time tradeoff as can be seen from Figure 3. The cost-recovery time trade-off will not be linear as the cost to shorten the recovery time, particularly if it is necessary to recover critical activities, processes, and systems, within minutes will require significant investment in replication of systems, mirroring of data, redundancy of communication and infrastructure, and an alternate site that is quickly activated.

Figure 3:
Figure 3:

Trade-off between Cost and Recovery Time

Citation: Technical Notes and Manuals 2011, 005; 10.5089/9781475504705.005.A001

Figure 3 is drawn from page 4 of Australian National Audit Office (2009), with the modification to show non-linearity as the cost of mitigation is likely to increase exponentially if the recovery time is reduced to minutes rather than hours and days.

The cost of establishing and maintaining an alternate site could be high, not only in terms of the initial investment in the facility and all the equipment needed but also in terms of maintaining each system and renewing the equipment when changes or updates are made at the primary site. Also, it is important to ensure that the alternate site is sufficiently far away from the primary site so that both are unlikely to be affected by the same incident or event. For example, it would be important to ensure that the alternate site is located on a different power grid and/or provider as well as a different telephone exchange and/or provider so that both sites are not impacted simultaneously. Regularly using the alternate site for training and testing can provide some benefits to compensate for the cost.

The recovery of treasury’s most critical activities, processes and systems are likely to be hours or for some activities 1-2 days, although there could be end-of-day activities or processes that may need to be completed before day’s-end. In these cases, it may be more cost effective to prepare manual processes which can be activated if a disruption occurs. The cost-recovery trade-off should be considered as part of the business impact analysis and the mitigation strategies that treasury will implement.

Importance of BCP/DRP to Treasury Operations

The relationship between operational risk, emergency response, incident and business continuity management or planning for a business disruption or event is shown in Figure 4. These management activities are scalable, depending on the operating context of the treasury. It may be that in a small, non-complex or less time-critical treasury, some or all of these activities are combined. In a treasury that is large, complex, or geographically dispersed, the use of separate emergency response, incident management and business continuity management teams increases the need for clear roles and responsibilities, and effective communication. The focus of this TNM is business continuity management or planning.

Figure 4:
Figure 4:

Relationships in Managing a Business Disruption

Citation: Technical Notes and Manuals 2011, 005; 10.5089/9781475504705.005.A001

Source: Page 2 of Australian National Audit Office (2009).

Treasury’s policy for business continuity planning should be to:

  • perform a business impact analysis, and develop mitigation strategies, which will ensure the continuity of its business, operations and technology components in the event the existing environment is unavailable;

  • develop and maintain a comprehensive business continuity and disaster recovery plan (BCP/DRP) to ensure that essential/critical treasury activities are recoverable;

  • business continuity planning and the BCP/DRP should be developed in accordance with international standards such as the Business Continuity Management standard BS-25999 or International Standards Organization ISO-27031; and

  • report the status of business continuity planning and the BCP/DRP annually to the treasurer and senior management in the ministry of finance.

The BCP/DRP for treasury should be an integral part of the ORM framework and developed to ensure that the following objectives are met:

  • government’s interests are protected in terms of reputation, reporting and resource impact, and impact on treasury operations;

  • government meets all statutory, contractual and market obligations;

  • should an essential/critical activity be disrupted by an incident or event, this activity is re-established within the designated recovery period using the DRP; and

  • BCP/DRP is an integral part of treasury’s day-to-day operations and that it is regularly updated with ongoing staff training and testing.

Six-Step Process to Develop a BCP/DRP

To develop the BCP/DRP, a six-step process is recommended as follows (each step is described in more detail in the next section):

  • Step 1: Document business activities and critical processes and systems

  • Step 2: Undertake business impact analysis to assess probability and impact

  • Step 3: Develop BCP/DRP (include third parties)

  • Step 4: Implement or update BCP/DRP

  • Step 5: Training to imbed into the day-to-day operations of the treasury

  • Step 6: Regular (annual) testing and updating

Developing a BCP/DRP

Step 1: Document Business Activities

The first step is for treasury to fully understand the activities, processes and systems and identify the key risks that might impact on their operations. Process maps and process-flow analysis can be used along with existing procedure manuals to understand treasury operations. The risk champion suggested above can oversee this process to ensure a common understanding and consistency of approach and terminology. This should be at a level that will balance the amount of detail and usefulness to senior management and the overall process.

The key is to identify critical processes and systems and the time period when these processes and systems are required. This will determine the criticality of each activity, process and system in terms of the time period (minutes, hours or days) that treasury is unable to maintain essential/critical operations. A table of essential/critical systems should be developed and maintained by treasury (an example is provided as Table 1 below). It will set out the time period when each system is required, the data that will be recovered from the back-up, and the location where the system can be accessed should an incident occur.

Table 1.

Treasury Critical Systems Framework

article image

Step 2: Business Impact Analysis

A business impact analysis will involve everyone responsible for treasury operations, including the more junior staff, as it helps to develop a risk understanding and a risk culture within treasury. This can be done by convening workshops and brainstorming sessions for each treasury function. For each category of operational risk and incident that may affect treasury as set out in Table 2, treasury should assess the risk exposures as a result of an incident or event affecting their operations. This requires separately assessing the probability and the impact, for example using a combination of Very-High / High / Medium / Low / Very Low Probability and Catastrophic / Major / Moderate / Minor / Insignificant Impact from a reputation, reporting and resource, or impact on treasury operations perspective as explained in Table 3.

Table 2.

Incidents that May Affect Treasury Operations

article image
Table 3.

Mexico Impact Criteria Framework

article image
article image
The table is based on the framework developed for the Federal Treasury in Mexico. The author would like to acknowledge the effort of treasury staff that helped to prepare the impact criteria framework.

Not all operational risks will be of equal importance for treasury as this will be specific to the environment and risks faced. For treasury, there are three impacts that may need to be considered with the analysis:

  • Reputational impact: that may lead to a loss of confidence by the government, loss of market confidence, media coverage, and/or a high-level ministerial or Parliamentary enquiry

  • Reporting and resource impact: that may be reported to the government or senior management within government-or external to regulators-and/or significant time is spent dealing with the issue

  • Impact on treasury operations: that may result in failure to meet treasury’s payment and other obligations and maintain the treasury activities for the effective functioning of the government

Under each of the three impacts, treasury should undertake an assessment of what are the factors that will impact according to each of the five assessment categories. An example of how this can look is shown in Table 3. Clearly, this table will vary according to the activities that are the responsibility of treasury and the priorities that are assigned or implicit in treasury operations.

For each business activity, process and system used in the business impact analysis, treasury will then associate a probability to the occurrence of an incident/event and also an impact rating assuming that the incident/event were to occur. Those activities assessed by treasury with a rank of 4 and 5 are identified in the event of an incident according to Table 4. Depending on its risk tolerance level, treasury may wish to also include the rank of 3, particularly where the impact could be catastrophic either in terms of reputation, reporting and resource, or impact on treasury operations.

Table 4.

Risk/Impact Matrix

article image

The final key element of the business impact analysis is the time criticality of each system and process across treasury operations. This requires assessing the maximum period that treasury can be without access to the system or process before it materially impacts on its operations under any of the categories above. It is normal to categorize each system or process using time periods such as by end-of-day, within 24 hours (it could be less if needed), 48 hours, 72 hours, 5 business days, or more than 5 business days. Table 1 can be used for this purpose.

A detailed mitigation strategy then needs to be developed for those incidents or events that are ranked as 4 and 5 in Table 4. If the number of incidents or events with these rankings is high, the matrix will clearly signal that there is a need for an alternate site and a well documented disaster recovery plan. The BCP/DRP will then set out critical information such as (1) critical systems and processes; (2) contact lists for key staff/teams; (3) standard procedures when invoking the plans; and (4) details of the recovery infrastructure including teams and documentation to be stored in the treasury office (primary site) and recovery location (alternate site).

Step 3: Develop Business Continuity and Disaster Recovery Plan

Once the business impact analysis has been completed, treasury should develop strategies that concentrate on improving resilience and ensuring mitigation techniques are put in place for those incidents or events ranked as 4 and 5 in Table 4. For these areas, treasury should select the most cost effective and suitable risk treatment using one or more of the responses set out above. A business continuity planning report is then submitted to senior management on the greatest risks, the techniques to mitigate, control, or limit the risks, the actions that are recommended to address the greatest exposures including activation of a DRP, and an estimate of costs. Senior management can then assess the cost-risk trade-off before making decisions and seeking approval from the treasurer and/ or senior management in the ministry of finance.

An integral part of business continuity planning will be a Disaster Recovery Plan (DRP) which documents the recovery component of the BCP. It facilitates the (i) smooth transition to recovery operations following a major incident or event (or disaster); (ii) escalation of recovery operations in the event of a prolonged disruption; and (iii) return to normal operations as quickly as possible. An important part of the DRP is the structure of incident management and recovery teams along with the administration and IT support. An example of a command center structure is provided as Figure 5.

Figure 5:
Figure 5:

DRP Command Center Structure

Citation: Technical Notes and Manuals 2011, 005; 10.5089/9781475504705.005.A001

Step 4: Implement the BCP/DRP

Once the BCP/DRP has been approved, the risk champion or risk management unit can oversee the implementation of the BCP/DRP and incorporate it into the wider ORM monitoring and control policies and procedures for treasury. This will include raising awareness with external parties to cover all activities external to treasury of the BCP/DRP and ORM framework in order that they understand their respective roles in maintaining business continuity and during the activation when required of the DRP. The risk champion or risk management unit will be responsible for maintaining and ensuring compliance with the requirements set out in the BCP/DRP.

Treasury should also introduce the requirement that third party providers have in place a BCP/DRP and this should be included in service level agreements or a memorandum of understanding. These third parties would include the central bank, providers of telecommunication and banking services, and relevant external IT providers. It would also be useful for treasury to integrate its BCP/DRP with other critical systems such as the government’s integrated financial management information system (IFMIS), debt recording and management system, and other key systems in ministry of finance.

Step 5: Training

Staff in treasury needs to understand its roles and responsibilities in compliance with the BCP/DRP and wider ORM policies and procedures. They may also need to take on additional responsibilities to introduce and maintain risk-reduction or mitigation strategies for their respective area. The BCP/DRP should include a section on training with training exercise/scenarios and the frequency of such training.

Training should be managed by the risk champion or risk management unit and undertaken for all treasury staff members and should consist of:

  • awareness presentations for existing employees (may also possibly be incorporated into a treasury orientation/induction program for new employees)

  • provision of a training manual

  • interactive training (Intranet)

If treasury has an alternate site, this can provide a valuable training facility as regular testing at the alternate site can be integrated with the training program. For example, it will enable staff in treasury to become familiar with the alternate site and how treasury operations can be run should an incident or event occur that may lead to relocation. While it is normal to rely on experienced staff that are deemed critical to treasury operations, this process can broaden knowledge and experience in order to reduce key person risk. Moreover, critical staff may not be available when an incident or event occurs and other staff can be called upon to provide the necessary backup in this situation. Some organizations have staff permanently at the alternate site with staff that can be rotated. This both ensures familiarity, and facilitates a quick start-up. It also allows continuity in the event that the primary site is completely destroyed.

Step 6: Regular Testing and Updating

No matter how well designed and thought-out the BCP/DRP may seem, international experience shows that it will very rarely work in practice without realistic and robust testing. The critical systems and processes of treasury should be tested annually and the BCP/ DRP updated based on the results of each test and the need for continual improvement. It is important each system and process be individually tested. Testing can be disruptive as it requires commitment of staff to ensure sufficient resources are available. It is not recommended the BCP/DRP be tested as a whole as this would be resource intensive and may affect normal operations–unless it is at the weekend. A test exercise using a scenario approach is one option (this can involve a walk-through test or activation of DRP and testing at the alternate site) but a ‘live’ test is viewed as the only way to fully test the DRP. The testing could be done in conjunction with the testing of the other systems such as IFMIS and the central bank’s own DRP. An example of the maintenance and testing of the BCP/DRP is shown in Table 5.

Table 5.

DRP Timeframe for Maintenance and Testing

article image

Maintaining the BCP/DRP requires an ongoing monitoring process to assess its effectiveness and whether it is in accordance with the wider ORM policies and procedures. This is achieved through a combination of ongoing monitoring activities and periodic testing including the annual testing of the DRP. Ongoing monitoring occurs in the normal course of treasury operations; and it is the responsibility in the first instance of line managers, with coordinating responsibility assigned to risk champion or risk management unit. As was noted earlier, the BCP/DRP can be improved over time as experience develops, particularly when there is a history of incidents or events and their impact in terms of reputation, reporting and resource, or impact on treasury operations. The six-step process set out above should be revisited on an annual basis, although the first step may just involve an update of the business activities, processes and systems reflecting changes from the previous assessment.

All new business activities should be reported to the risk champion or risk management unit during the planning phase. As for changes to existing procedures and systems, these will also be reported to the risk champion or risk management unit. Business cases should include an evaluation of business continuity risks, and project budgets must include adequate provision for appropriate preventative and recovery countermeasures. No critical systems or new business activities should be put into production until suitable recovery arrangements have been implemented and tested.

Activating the Disaster Recovery Plan

Command Center Structure

Should an incident or event occur that impacts on essential/critical treasury activities and/or necessitate relocation from the primary site, an incident management process will be established in a command center to manage the relocation and/or recovery. Figure 5 sets out the individuals and teams and interrelationships between those responsible for managing a recovery following an incident or event. This is to ensure that when an incident or event occurs, a well-defined incident management structure is in place to ensure:

  • the efficient flow of information

  • consistent decision making

  • effective communication of decisions

In the event of an incident or event, staff that has been pre-nominated and are available will relocate to the alternate site to recommence business. This simplifies the logistics of planning the recovery, reduces confusion amongst staff, and allows telephone diversion plans to be prepared and lodged with the telecom providers in advance. A degree of flexibility will be needed to cater for different incidents. However, the number of recovery locations used should be kept to a minimum to facilitate staff communication and emergency management.

Should an incident or event occur that requires building evacuation or denies access to the building, the emergency command center will need to be established in the alternate site (if this is in place) or some designated location. Some incidents or events may not affect all business units or the entire building. In this case, it may be practical to relocate affected staff to meeting rooms or other vacant space with the assistance of business systems and support vendors. Increasingly, the ability to work from home has become a viable and effective option in some incidents. For example, with the H1N1 pandemic, staff in the Treasury in Mexico that were confined to their homes but well enough to work were set up to work from home. This is more feasible with web-enabled systems, good internet services, encryption, and firewalls that are put in place beforehand.

The primary role of the command center is for the coordination, control and exchange of information across treasury. The command center team initiates the decision-making process for problems and major incidents that may or may not require business relocation. Crisis management and decisions of an immediate nature are also part of the responsibility of the team. This will include managing communications with external parties, such as the media and major external groups.

Members of the command center and associated groups include:

  • ministry of finance senior management and the treasurer

  • representative(s) from business systems/IT

  • representatives from support services such as HR, administration and/or building services

The responsibilities of all command center members will be to meet at the emergency command center location (alternate site if available or another designated location) in order to:

  • provide a central point of contact for all matters relating to the recovery operation for staff, suppliers, and media

  • facilitate the collection and collation of information relating to the status of the emergency and progress of the recovery

  • facilitate the distribution of instructions to staff, counterparties, and other affected third parties

The responsibilities of the command center team include:

  • quickly making the decision to invoke recovery activities based on available information

  • coordinating communications with ministry of finance

  • manage communications with the media either directly or through a media liaison person

  • maintain the flow of information to staff, counterparties and other key stakeholders

  • approve significant expenditure associated with the recovery

  • monitor compliance requirements throughout the recovery process

  • ensure that effective security is maintained in the locations where recovery activities are being undertaken

  • determine how the scope of recovery activities will be escalated in the case of significant incidents

  • plan and manage the restoration and recommissioning of the treasury primary site

Business systems should address the recovery of essential/critical IT infrastructure processes and systems. Some will involve the input of third parties to initiate call diversion and assist in re-routing other communications facilities. Treasury should ensure that service level agreements with key third party information providers reflect recovery requirements and include the provision for participation in testing exercises.

Case of UK DMO–Business Recovery Management

Objectives

In addition to the Incident Management Plan, further procedures are necessary to ensure the individual business operations are recovered in an effective and timely manner. Guidance on the steps to follow is covered under Business Recovery Management.

Business Recovery Management is used in conjunction with the Impact Analysis component of the BCP. Whereas the Impact Analysis will provide a status report of how an incident may affect certain critical functions, Business Recovery Management looks at how the business operations are recovered following the incident.

The Impact Analysis provides actions and workarounds for specific critical processes. Business Recovery Management is used to assess and determine approaches to restoring key business operations.

Business Recovery Steps

Step 1: Business Assessment (Managers and/or Team Leaders)

  • Establish the current status of each business activity

  • Confirm IT system and resource availability for each business activity

  • Assess market conditions following any widespread incident

  • Establish status of key stakeholders

Step 2: Status Report (Managers and/or Team Leaders)

Provide status reports to senior management for each business area including:

  • High priority activities to be completed

  • Activities that will be suspended

  • Systems that are currently unavailable

  • Resource requirements and availability

  • Feedback from stakeholders

Step 3: Prioritization

  • Management responsible for each business area to determine the order of priorities for their respective areas

  • Senior Managers to confirm priorities of key business operations and communicate to Managers and Team Leaders

  • IT to be made aware of system requirements based on business priorities

Step 4: Decision-making

  • Any strategic decisions referred to appropriate forums.

  • Decisions on whether to suspend or cancel any specific operations

  • Decisions should be documented and reported to relevant business areas

Step 5: Implementation

  • Individual teams to implement agreed business activities using any manual workarounds as identified in the Impact Analysis

  • Staff to report progress and completion of activities to management so that subsequent assessments and prioritizations can be made

  • Any statements to stakeholders made in respect of any revised or suspended activities

Step 6: Returning to Main Office Location

Once the building manager has given clearance for reoccupation of main office location and the systems & telecommunications infrastructure have been restored, the remigration will require:

  • Validation that the infrastructure has been restored through testing by business areas, coordinated by Team Leaders

  • A detailed plan of migration to be prepared by the IT management team including synchronizing and testing the cutting back of systems and re-setting the disaster recovery site–the detail of this will depend on the nature and impact of the original incident

  • Senior Management Group should meet and agree a communication strategy involving an announcement to the market and advising key contacts of the remigration

Business systems role will also include managing the:

  • restoration of the e-mail, internet and other essential communication services

  • restoration or rerouting of electronic payment or banking systems with central bank and any commercial banks

  • retrieval of back-up data and restoration of data to resume critical functions at the recovery location

  • procurement, configuration and deployment of additional user workstations, peripheral equipment, network and cabling capacity, phone lines and handsets

  • procurement, configuration and deployment of additional server equipment and telephony services to support the escalation of recovery activities when recommissioning of the treasury primary site is likely to take more than, say, two weeks

  • third party liaison to provide user support

  • technology project management of the restoration and recommissioning of the treasury primary site

  • cut-over to normal operations and decommissioning of temporary services

Support services (HR, administration and building services staff) will be expected to report to the command center team and provide assistance as directed. This may include:

  • tracking staff whereabouts and ensuring staff safety and welfare

  • answering the phones and relaying messages

  • contacting staff to relay messages and confirm availability

  • arranging catering, accommodation, trauma counseling, emergency payments, organisation of child care, staff rotation etc

  • ensuring security is enforced at the incident and any temporary recovery location

  • facilitation of insurance claims and emergency purchasing

  • redirection of mail and couriers

Emergency Response

Following an incident or event, emergency response will comprise the following phases:

  • Evacuation and Containment: includes the actions by emergency response personnel to contain the incident, assure the safety of staff, prevent further damage or loss and ensure the treasury primary site is secure

  • Damage Assessment: members of the command center team (including business systems and support services) evaluate the magnitude of the incident or event and decide upon a course of action and/or recovery

  • Recovery Decision: based on the damage assessment, a decision is made regarding how and where to recover essential/critical business functions. If the incident or event can be isolated and contained, actions are taken to restore treasury operations using standard operating policies and procedures. It is important that all staff are made aware of their role during a recovery operation and that recovery information is clearly and regularly delivered to staff. This will be for staff to either return home until they hear otherwise or relocate to the alternate site

The objective for the emergency response is to minimize the risk to treasury’s business activities and operations in the primary site. This is achieved by reducing or if necessary halting activities until the recovery infrastructure is established with the primary objective of re-establishing critical activities within 24 hours (or if needed by the end-of-day) and other essential activities within 48-72 hours.

Each staff member should be issued with an information sheet and important contact details (treasury, ministry of finance and central bank), including existing mobile and home telephone numbers, external contact details, and treasury key contacts. This information can be made available in a format that can be stored on treasury staff mobile phones, iPads, laptops or other media for ease of access and recovery of this information.

Business Recovery

Once a course of recovery action has been decided upon, business recovery will follow in this order:

  • Activate Recovery Infrastructure: the BCP for systems and communications infrastructure needs to be invoked with inbound calls being diverted and key production systems reverting to the alternate site. For all essential/critical applications, data will be accessed at the alternate site from restored systems or through a data center if applicable. For services provided by third parties such as the central bank, staff may be able to relocate to third party premises to work from designated systems.

  • Survival Level Operations: initially the business activities at treasury or the alternate site should be limited to core activities. For less time-critical functions, these can be temporarily suspended and/or staff directed to work from home.

  • Escalation: if the incident is severe enough to warrant an extended period away from the primary site (generally exceeding two weeks), business activity may be escalated since a prolonged period at survival level operations could exacerbate the impact of the incident, affect the ability of treasury to maintain essential/critical activities, processes, and systems, and cause undue stress for staff. Where practical, escalation priorities can be predetermined with indicative timeframes noted for the recovery of each business activity or process.

  • Primary Site Recommissioning: this includes actions taken to salvage, restore or replace damaged or lost property, facilities and services at the primary site and the process of recommencing business at the primary site.

Post Incident Review

A comprehensive review can then be carried out to ensure that the recovery plan and infrastructure are updated or improved based on the experience of the incident. In particular, each of the six-step processes can be examined to identify weaknesses and/or omissions and the results used to revise and update the BCP/DRP. This may lead to changes to business processes, underlying infrastructure including systems and facilities at the alternate site, enhanced training, and testing among other changes identified in this phase.

Conclusion

Putting in place an ORM framework including a BCP/DRP should be seen as a priority for any treasury given the operational risks that they face and critical functions and activities that they perform. The development of a BCP/DRP should not be seen as a one-off project but should become an integral part of the day-to-day operations of treasury. The six-step process to develop, implement, test and maintain the BCP/DRP will provide the treasury with the practical steps needed to ensure that this occurs.

References

  • Australian National Audit Office (2009), Business Continuity Management: Building Resilience in Public Sector Entities, Best Practice Guide–June 2009 [http://www.anao.gov.au/~/media/Uploads/documents/business_continuity_management_.pdf]

    • Search Google Scholar
    • Export Citation
  • Bank for International Settlements (2003), Sound Practices for the Management and Supervision of Operational Risk, Basel Committee on Banking Supervision [http://www.bis.org/bcbs/ index.htm]

    • Search Google Scholar
    • Export Citation
  • British Standards Institution (2006), Business Continuity Management: Code of Practice [http://www.bsigroup.com/en/Assessment-and-certification-services/management-systems/Standards-and-Schemes/BS-25999/]

    • Search Google Scholar
    • Export Citation
  • Committee of Sponsoring Organizations (COSO) of the Treadway Commission (2008), Internal Control–Integrated Framework: Guidance on Monitoring Internal Control Systems, Volumes I, II and III [http://www.coso.org]

    • Search Google Scholar
    • Export Citation
  • Hakan Tokaç and Mike Williams (2011 forthcoming), Government Debt Management and Operational Risk: A Risk Management Framework, and how it was applied in Turkey, OECD/EU

    • Search Google Scholar
    • Export Citation
  • International Organization for Standardization (2011), ISO-27031: Information Technology–Security Techniques–Guidelines for Information and Communication Technology Readiness for Business Continuity [http://www.iso.org/iso/catalogue_detail?csnumber=44374]

    • Search Google Scholar
    • Export Citation
  • TransConstellation (2007), Best Practices in Qualitative Operational Risk Management: The ORM Reference Guide [http://www.transconstellation.com]

    • Search Google Scholar
    • Export Citation
  • TransConstellation (2007), Roadmap to Operational Risk Management Success: The ORM Maturity Benchmark [http://www.transconstellation.com]

    • Search Google Scholar
    • Export Citation
  • World Bank (2010), Guidance for Operational Risk Management in Government Debt Management, Tomas Magnusson, Abha Prasad and Ian Storkey [http://siteresources.worldbank.org/INTDEBTDEPT/RelatedPapers/22491571/OperationalRiskManagement201003.pdf]

    • Search Google Scholar
    • Export Citation

Annex: BCP/DRP Checklists7

The following provides a set of checklists and templates that can be used to develop the BCP/DRP.

Checklist 1: Implementation of BCP

article image

Checklist 2: Identify Critical Business Processes and Systems

article image
article image

Template: Requirements Necessary to Perform Each Critical Process or System

article image
Note: repeat for each critical process or system.

Checklist 3: Undertaking a Busines Impact Analysis

article image

Checklist 4: Examining Options to Minimize Disruptions

article image

Checklist 5: Alternate Site Considerations

article image

Template: Table of Contents for BCP/DRP

article image
1

Note: Ian Storkey is an international consultant specializing in government debt and cash management and is on the Fiscal Affairs Department roster of experts. This note has benefitted from comments from Mario Pessoa (FAD), Israel Fainboim (FAD), Mike Williams (consultant) and the Mexican Federal Treasury. The author would also like to acknowledge the information obtained or provided by the governments in Australia, Chile, Turkey and United Kingdom.

2

Basel II “International Convergence of Capital Measurement and Capital Standards: A Revised Framework”, published by the Bank for International Settlements in June 2004.

3

The Basel Committee on Banking Supervision has members from 28 countries that provide a BIS forum for regular cooperation on banking supervisory matters. The Committee of Sponsoring Organizations of the Treadway Commission (COSO) is a joint initiative of five private sector organizations and is dedicated to the development of frameworks and guidance on enterprise risk management, internal control and fraud deterrence. TransConstellation is a Belgian not-for-profit entity in the field of financial-transaction processing with members that include Banksys, Euroclear, Fin-Force, SWIFT and The Bank of New York (Brussels office).

4

For more information on each of the steps, refer to “Guidance for Operational Risk Management in Government Debt Management” published by the World Bank in March 2010.

6

On June 15, 2011, ISAE No.3402 replaced the Statement on Auditing Standards (SAS) No.70, Service Organizations that had been developed by the American Institute of Certified Public Accountants (AICPA).

7

The checklists have been drawn from Australian National Audit Office (2009) and modified to cover treasury operations.

  • Collapse
  • Expand
Operational Risk Management and Business Continuity Planning for Modern State Treasuries