Summary of Supplementary Proposal

This paper sets forth additional staff proposals for: (i) automatic termination of arrangements under the Standby Credit Facility (SCF); and (ii) further modification to the proposal on alignment of the market access criterion for exceptional access with that for blending. These proposals constitute an integral part of the reform package set forth in 2018–19 Review of Facilities for Low-Income Countries—Reform Proposals (“LIC Facilities Review”) (including Supp. 1). The paper summarizes key aspects of these proposals and includes the revised proposed Decision I to implement the reform. The paper also contains Decisions II-V, which remain unchanged from those issued under Supp. 1, as well as the redlined texts showing the proposed amendments, for the convenience of Directors.

1. It is proposed that SCF arrangements with initial duration of more than 24 months or those extended to more than 24 months will automatically terminate if no program review has been completed over an 18-month period.1 A similar automatic termination provision currently exists for arrangements under the Extended Credit Facility (ECF), but not for SCF arrangements which at present have a maximum duration of only two years. With the proposed extension of SCF arrangements to a maximum of three years, adding an automatic termination feature to the SCF would allow a more efficient use of limited PRGT resources by unlocking funds that would otherwise remain committed until the expiration date of the arrangement or the early termination of the arrangement at the request of the member. The reform would also ensure consistency across ECF and SCF arrangements.

2. The automatic termination would apply only to new SCF arrangements approved after the adoption by the Executive Board of this reform. As is the case for ECF arrangements, the new framework would permit the Executive Board, at the authorities’ request, to extend the eighteen-month period for up to three additional months, provided that: (i) this extension does not fall outside the existing period of the arrangement; and (ii) an understanding between the authorities and staff on targets and measures to put the SCF-supported program back on track appears imminent. However, the arrangement would automatically expire at the end of the further extended period unless a program review is completed.2

3. It is also proposed to further modify the proposal on the alignment of the market access criterion for exceptional access with that used in blending as set forth in Decision I in Supp. 1. In aligning the market access criterion for exceptional access with the market access criterion used in blending, Decision I in Supplement 1 refers to issuance or guarantee of eligible external debt by the sovereign during at least 2 of the past 5 years in a cumulative amount of at least 25 percent of quota. It is proposed to further revise the reference to “eligible external debt” to align past market access with relevant definitions under the Executive Board Decision governing eligibility to concessional assistance under the PRGT (i.e., Decision No. 14521-(10/3), as amended).

4. The reform proposal set forth above constitutes part of the package of proposals set forth in the LIC Facilities Review. Accordingly, a revised proposed Decision I is included for consideration of Executive Directors which sets forth: (i) all the proposed amendments to the Poverty Reduction and Growth Trust Instrument set forth in Supp. 1; (ii) the provisions on automatic termination of SCF arrangements; and (iii) further modification to the proposal on alignment of the market access criterion for exceptional access with that for blending. A redlined version of the PRGT Instrument is attached for the convenience of Executive Directors in Annex I. Decisions II-V as well as the redlined texts showing the proposed amendments, which remain unchanged from those issued under Supp. 1, are also attached for the convenience of Directors.

Proposed Decisions

The following decisions, which may be adopted by a majority of the votes cast, are proposed for adoption by the Executive Board:

Decision I. Amendments to the PRGT Instrument

The Instrument to Establish the Poverty Reduction and Growth Trust (“PRGT Instrument”), Annex to Decision No. 8759-(87/176) ESAF, adopted December 18, 1987, as amended, along with its Appendices, shall be amended as follows:

Initial duration and extension of ECF arrangements

In Section II, paragraph 1(b) (1) of the PRGT Instrument, the references to “up to four years” in the first and second sentences shall be replaced by “up to five years”.

Initial duration and extension of SCF arrangements

In Section II, paragraph 1(c) (1) of the PRGT Instrument, the reference to “from one to two years” in the second sentence shall be replaced by “from one to three years”; the word “or” shall be added in the ninth sentence after the words “the next twelve months”; the reference to “or the automatic termination of the SCF arrangement” shall be added in the tenth sentence after the words “or the cancellation of the SCF arrangement by the member”; and the reference to “two and a half years out of any five-year period” in the penultimate sentence shall be replaced by “three years out of any six-year period”.

Overall amount of access under PRGT arrangements

Section II, Paragraph 2(a) shall be amended to read:

“(a) The overall access of each eligible member to the resources of the Trust under all facilities of the Trust as specified in Section I, Paragraph 1(a) shall be subject to (i) an annual limit of 100 percent of quota; and (ii) a cumulative limit of 300 percent of quota, net of scheduled repayments. The Fund may approve access in excess of these limits in cases where the member is experiencing an exceptionally large balance of payments need, has a comparatively strong adjustment program and ability to repay the Fund, does not have sustained past access to international financial markets, and has income at or below the prevailing operational cutoff for assistance from the International Development Association (IDA); provided that access shall in no case exceed (i) a maximum annual limit of 133.33 percent of quota, and (ii) a maximum cumulative limit of 400 percent of quota, net of scheduled repayments. For the purpose of this sub-paragraph, a member is deemed to have sustained past access to international financial markets if, in addition to having income above 80 percent of the IDA operational cutoff, the public debtor has issued or guaranteed external bonds or has received disbursements under external commercial loans contracted or guaranteed by the public debtor, as defined in Executive Board Decision No. 14521-(10/3), as amended, during at least two of the past five years in a cumulative amount equivalent to at least 25 percent of the member’s quota.”

Sub-limits for access under the RCF

Section II, Paragraph 2(b) on the access limits applicable to RCF disbursements shall be amended to read:

“(b) The access of each eligible member under the RCF shall be subject to an annual limit of 50 percent of quota, and a cumulative limit of 100 percent of quota, net of scheduled repayments, subject to the following provisions:

(i) each disbursement shall not exceed 25 percent of quota except where the member requests assistance under the RCF to address an urgent balance of payments need resulting primarily from a sudden and exogenous shock (including a large natural disaster under (ii) below) and the member’s existing and prospective policies are sufficiently strong to address the shock;

(ii) the annual and cumulative access limits under the RCF shall be 80 percent of quota and 133.33 percent of quota, net of scheduled repayments, respectively, where (a) the member requests assistance under the RCF to address an urgent balance of payments need resulting from a natural disaster that occasions damage assessed to be equivalent to or to exceed 20 percent of the member’s gross domestic product (GDP), and (b) the member’s existing and prospective policies are sufficiently strong to address the natural disaster shock; and

(iii) outstanding credit by a member under the rapid-access component of the ESF or outstanding purchases from the General Resources Account under emergency post conflict/natural disaster assistance covered by Decision No. 12341-(00/117), shall count towards the annual and cumulative limits applicable to access under the RCF. With effect from July 1, 2015, any purchases from the General Resources Account under the Rapid Financing Instrument shall count towards the annual and cumulative limits applicable to access under the RCF.”

Sub-limit on precautionary use of the SCF

Section II, Paragraph 2(c) establishing sub-limits on access at approval of precautionary SCF arrangements shall be deleted from the PRGT Instrument to abolish such sub-limits.

Increase in the threshold for lapse of time procedures for ECF and SCF augmentation requests

Section II, Paragraph 2(h) shall be amended to increase the threshold for lapse of time procedures for ECF and SCF augmentation requests.

“(h) The amount of resources committed to a qualifying member under an ECF or SCF arrangement may also be increased by the Trustee in an ad-hoc review between scheduled reviews under the arrangement to address an increase in the underlying balance of payments problems of the qualifying member where the problem is so acute that the augmentation cannot await the next scheduled review under the arrangement. The Trustee, however, shall not approve requests for augmentation at an ad hoc review if the scheduled review associated with the most recent availability date preceding the augmentation request has not been completed. In support of a request for augmentation between scheduled reviews under an ECF or SCF arrangement, the member will describe in a letter of intent the nature and size of its balance of payment difficulties, and any information relevant to program implementation, including exogenous developments. Before approving such augmentation, the Trustee shall be satisfied that the program remains on track to achieve its objectives at the time of the augmentation, based on the information provided by the member, and, in particular, that the member is in compliance with any continuous performance criteria or that a waiver of nonobservance is justified and that all prior actions have been met. Requests for augmentation of access that do not exceed 15 percent of quota would be considered for approval on a lapse-of-time basis as provided for in Decision/A/13207, as amended. Following its approval by the Trustee, the augmentation of access under the arrangement will not exceed the amount immediately needed by the member in light of its balance of payments difficulties and will become available to the member in a single disbursement, which the member may request at any time until the availability date of the next scheduled disbursement under the ECF or SCF arrangement. A program review following an augmentation of access under the arrangement between scheduled reviews would be expected to include a comprehensive review of policies under the program. In order to allow the Trustee to undertake such a comprehensive assessment of the member’s policies, this review may not be completed on a lapse of time basis.”

Poverty Reduction Strategy

Section II, Paragraph 1(b)(3) of the PRGT Instrument shall be amended to read:

“(3) (i) Subject to subparagraph (ii) below, the Trustee shall not complete the second or any subsequent review under an ECF arrangement unless it finds that: (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for an ECF arrangement or a review under an ECF arrangement. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) and a poverty reduction strategy that has been issued to the Executive Board as an Economic Development Document shall be deemed a PRGS. A PRGS shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.

(ii) In cases where a member has limited institutional capacity for meeting the PRGS requirement specified in subparagraph (i) above, the member may request approval by the Executive Board of an extension of the deadline for issuance of the PRGS up until the fourth review under the ECF arrangement. Any request for an extension shall be made no later than the time of the request for completion of the second review. A member may request approval of a further extension of the deadline for issuance of the PRGS up until the sixth review under the ECF arrangement, provided that: (A) the member can provide adequate justifications based on persistent limited institutional capacity for meeting the PRGS requirement and other urgent priorities; and (B) the member’s arrangement has a duration of at least four years, or an extension of the arrangement to at least four years is requested. Any request for such additional extension of the deadline for issuance of the PRGS shall be made no later than the time of the request for completion of the review corresponding to the extended deadline for the PRGS requirement.”

A new Section II, Paragraph 1(c)(4) of the PRGT Instrument shall be added to read:

“(4) The Trustee shall not complete the second or any subsequent review under an SCF arrangement with an initial duration exceeding two years unless it finds that: (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for an SCF arrangement or a review under an SCF arrangement. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) and shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.”

Defunct SCF Arrangements

A new Section II, paragraph 1(c)(5) of the PRGT Instrument will be added to read as follows:

“(5) A member may cancel an SCF arrangement at any time by notifying the Fund of such cancellation. An SCF arrangement for a member approved after the date of adoption of this decision, which has an initial duration of more than 24 months or is extended to more than 24 months, will automatically terminate before its term if no program review under the arrangement has been completed over a period of eighteen months. The Trustee, at the authorities’ request, may decide to delay the termination of the arrangement by up to three months in cases where the reaching of understandings between the authorities and the Trustee on targets and measures to put the SCF-supported program back on track within the term of the arrangement, appears imminent. The SCF arrangement will automatically terminate at the end of the extended period unless a program review under the arrangement is completed within this period.”

Decision II. Amendments to the Rapid Financing Instrument Decision

The Decision establishing the Rapid Financing Instrument (RFI), Decision No. 15015-(11/112), November 21, 2011, as amended, shall be amended as follows:

Paragraph 5 of the RFI decision shall be amended to read:

“Assistance under this Decision shall be made available to members in the form of outright purchases. Access by members to resources under this Decision shall be subject to (a) an annual limit of 50 percent of quota, and (b) a cumulative limit of 100 percent of quota, net of scheduled repurchases, provided that the annual access limit shall be 80 percent of quota and the cumulative access limit shall be 133.33 percent of quota, net of scheduled repurchases, where (i) the member requests assistance under the RFI to address an urgent balance of payments need resulting from a natural disaster that occasions damage assessed to be equivalent to or to exceed 20 percent of the member’s gross domestic product (GDP), and (ii) the member’s existing and prospective policies are sufficiently strong to address the natural disaster shock.”

Decision III. Amendments to the Policy Support Instrument Framework Decision

The decision establishing the Policy Support Instrument, Decision No. 13561-(05/85), October 5, 2005, as amended, shall be amended as follows:

Paragraph 5 of the PSI Decision shall be amended to read:

“5. Poverty Reduction Strategy (PRS) Documents. The member’s program will be based on the member’s poverty reduction strategy, which will be set forth in a Poverty Reduction and Growth Strategy (PRGS).”

Paragraph 8 (ii) of the PSI Decision shall be amended to read:

“(ii) The Trustee shall not complete the second or any subsequent review under a PSI with an initial duration exceeding two years unless it finds that (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for a PSI or a review under a PSI. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) as set forth in paragraph 5 above and a poverty reduction strategy that has been issued to the Executive Board as an Economic Development Document shall be deemed a PRGS. A PRGS shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.”

Decision IV. Amendments to the Transparency Policy Decision

Transparency Policy Decision, Decision No. 15420-(13/61), adopted June 24, 2013, as amended, shall be amended as follows:

Paragraph 4.a shall be amended to read:

“4. a. The Managing Director will not recommend that the Executive Board approve (i) an arrangement under the Poverty Reduction and Growth Trust (PRGT) or completion of a review under such arrangement, or (ii) a Heavily Indebted Poor Countries (HIPC) decision point or completion point decision, or (iii) a member’s request for a PSI or the completion of a review under a PSI, if the member concerned does not explicitly consent to the publication of its Interim Poverty Reduction Strategy Paper (I-PRSP), Poverty Reduction Strategy Paper (PRSP), PRSP preparation status report, PRSP annual progress report (APR), Economic Development Document (“EDD”) or Poverty Reduction and Growth Strategy (PRGS) (Document 10 or Document 15, as the case may be).”

Paragraph 11 shall be amended to read:

“11. After the Executive Board (i) adopts a decision regarding a member’s use of Fund resources (including a decision completing a review under a Fund arrangement), or (ii) adopts a decision approving a PSI or a PCI, or conducts a review under a PSI or a PCI, or (iii) completes a discussion on a member’s participation in the HIPC Initiative, or (iv) completes a discussion on a member’s I-PRSP, PRSP, PRSP preparation status report, APR, EDD, or PRGS in the context of the use of Fund resources or a PSI, a Press Release, which will contain a Chairman’s statement on the discussion, emphasizing the key points made by Executive Directors, will be issued to the public. Where relevant, the Chairman’s statement will contain a summary of HIPC Initiative decisions pertaining to the member and the Executive Board’s views on the member’s I-PRSP, PRSP, PRSP preparation status report, APR, EDD or PRGS in the context of use of Fund resources or a PSI. Waivers for nonobservance, or of applicability, of performance criteria, and any other matter as may be decided by the Executive Board from time to time (Document 21), and waivers for nonobservance of assessment criteria, and any other matter as may be decided by the Executive Board from time-to-time (Document 22), will be mentioned in the factual statement section of the Press Release or in a factual statement issued in lieu of a Chairman’s statement as provided for in paragraph 13(b). Before a Press Release is issued, it will, if any Executive Director so requests, be read by the Chairman to the Executive Board and Executive Directors will have an opportunity to comment at that time. The Executive Director elected, appointed, or designated by the member concerned will have the opportunity to review the Chairman’s statement, to propose minor revisions, if any, and to consent to its publication immediately after the Executive Board meeting. Notwithstanding the above, no Press Release published under this paragraph shall contain any reference to a discussion or decision pertaining to a member’s overdue financial obligations to the Fund, where a Press Release following an Executive Board decision to limit the member’s use of Fund resources because of the overdue financial obligations has not yet been issued. In the case of an Executive Board meeting pertaining solely to a discussion or decision with respect to a member’s overdue financial obligations, no Chairman’s statement will be published.”

Paragraph 13.b (i) shall be amended to read:

“(i) If a member does not consent to the publication of a Press Release containing a Chairman’s statement (Documents 7 and 20) under paragraph 11 where one would be applicable, or if no Chairman’s statement has been issued because a decision was taken on a lapse-of-time basis, a brief factual statement will be issued immediately after the Board consideration. The factual statement will describe the Executive Board’s decision relating to (a) that member’s use of Fund resources (including HIPC initiative decisions (Document 8), waivers (Document 21), and consideration of PRSP documents, EDDs and PRGSs (Document 10), when relevant), or (b) the approval of a PSI or a PCI for that member, or the conduct of a review under that member’s PSI or PCI (including waivers (Document 22) and consideration of PRSP documents, EDDs and PRGSs (Document 15), when relevant).”

Paragraph 28 shall be amended to read:

“28. Documents may be published under this decision only after their consideration by the Executive Board, except for documents that are circulated for information only including: (i) I-PRSPs, PRSPs, EDDs and PRGSs; and (ii) Reports on Observance of Standards and Codes (ROSCs) and Assessment of Financial Sector Supervision and Regulation (AFSSR) Reports. Documents covered by this paragraph may be published immediately after circulation to the Executive Board.”

Item 10 of Indicative List of Documents Covered by the Decision shall be amended to read:

“10. I-PRSPs, PRSPs, PRSP Preparation Status Reports, APRs, EDDs and PRGSs”

Item 15 of Indicative List of Documents Covered by the Decision shall be amended to read:

“15. I-PRSPs, PRSPs, PRSP Preparation Status Reports, APRs, EDDs and PRGSs in the context of PSIs”

Decision V. Amendments to the Decision on Web Posting of PRS Documentation

Decision No. 13816-(06/98), adopted November 15, 2006, as amended, shall be amended as follows:

“Web posting of Poverty Reduction Strategy Papers (PRSPs), Interim PRSPs, Annual Progress Reports of PRSPs, PRSP Preparation Status reports, Economic Development Documents and Poverty Reduction and Growth Strategies in accordance with the procedures outlined in SM/06/359 (10/25/06) shall be taken to constitute issuance of such documents to the Executive Board for the purposes of (1) Section II, paragraph 1(b)(3) and paragraph 1(c)(4) of the Instrument to Establish the Poverty Reduction and Growth Trust, Annex to Decision No. 8759-(87/176), adopted December 18, 1987, as amended; (2) Section III, paragraph 2(c) of the Instrument to Establish a Trust for Special PRGF Operations for the Heavily Indebted Poor Countries and Interim PRGF Subsidy Operations, Annex to Decision No. 11436-(97/10), adopted February 4, 1997, as amended; and (3) paragraph 8 of the Policy Support Instrument-Framework, Decision No. 13561-(05/85), adopted October 5, 2005, as amended.”

Annex I. Instrument to Establish the Poverty Reduction and Growth Trust—Redlined Version

Introductory Section

To help fulfill its purposes, the International Monetary Fund (hereinafter called the “Fund”) has adopted this Instrument establishing the Poverty Reduction and Growth Trust (hereinafter called the “Trust”), which shall be administered by the Fund as Trustee (hereinafter called the “Trustee”). The Trust shall be governed by and administered in accordance with the provisions of this instrument.

*******

Section II. Trust Loans

Paragraph 1. Eligibility and Conditions for Assistance

(a) The members on the list annexed to Decision No. 8240-(86/56) SAF, as amended, shall be eligible for assistance from the Trust.

(b) Assistance under the ECF

(1) Assistance under the ECF shall be committed and made available to a qualifying member under a single arrangement of no less than three years and up to four five years (hereinafter called an “ECF arrangement”) in support of a macroeconomic and structural adjustment program presented by the member. It would be expected that ECF arrangements would normally be approved for a period of three years, although arrangements for up to four five years may also be approved, where appropriate, and if the member so requests. The member shall also present a detailed statement of the policies and measures it intends to pursue for the first twelve months of the arrangement, and indicate how the program advances the member’s poverty reduction and growth objectives, in line with the objectives and policies of the program. The ECF arrangement will prescribe the total amount of resources committed to the member, the amount to be made available during the first year of the arrangement, the phasing of disbursements during that year, and the overall amounts to be made available during the subsequent years of the arrangement. Disbursements shall be phased at regular intervals no more than six months apart (one upon approval and at normally regular intervals thereafter) with performance criteria applicable specifically to each disbursement and appropriate monitoring of key financial variables in the form of quantitative benchmarks and structural benchmarks for critical structural reforms. Structural benchmarks may be targeted for implementation either by a specific date or by the time of a specific review under the ECF arrangement. The ECF arrangement shall also provide for reviews by the Trustee of the member’s program scheduled at intervals that are the same as those applicable to disbursements to evaluate the macroeconomic and structural reform policies of the member and the implementation of its program and reach new understandings if necessary. The determination of the phasing of, and the conditions applying to, disbursements after the first year of the ECF arrangement will be made by the Trustee in the context of reviews of the program with the member. At each review, the member will present a detailed statement describing progress made under the program, the policies it will follow during the next 12 months or up to the remaining period of the arrangement to further the realization of the objectives of the program, and how the program advances the country’s poverty reduction and growth objectives, with such modifications as may be necessary to assist it to achieve its objectives in changing circumstances.

(2) Before approving an ECF arrangement, the Trustee shall be satisfied that the member has a protracted balance of payments problem and is making an effort to strengthen substantially and in a sustainable manner its balance of payments position under a policy program that supports significant progress toward a stable and sustainable macroeconomic position consistent with strong and durable poverty reduction and growth.

(3) (i) Subject to subparagraph (ii) below, the Trustee shall not complete the second or any subsequent review under an ECF arrangement unless it finds that: (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for an ECF arrangement or a review under an ECF arrangement. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) and a poverty reduction strategy that has been issued to the Executive Board as an Economic Development Document shall be deemed a PRGS. A PRGS shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.

(ii) In cases where a member has limited institutional capacity for meeting the PRGS requirement specified in subparagraph (i) above, the member may request approval by the Executive Board of an extension of the deadline for issuance of the PRGS up until the fourth review under the ECF arrangement. Any request for an extension shall be made no later than the time of the request for completion of the second review. A member may request approval of a further extension of the deadline for issuance of the PRGS up until the sixth review under the ECF arrangement, provided that: (A) the member can provide adequate justifications based on persistent limited institutional capacity for meeting the PRGS requirement and other urgent priorities; and (B) the member’s arrangement has a duration of at least four years, or an extension of the arrangement to at least four years is requested. Any request for such additional extension of the deadline for issuance of the PRGS shall be made no later than the time of the request for completion of the review corresponding to the extended deadline for the PRGS requirement.

(4) A member may cancel an ECF arrangement at any time by notifying the Fund of such cancellation. An ECF arrangement for a member approved after the date of adoption of this decision will automatically terminate before its term if no program review under the arrangement has been completed over a period of eighteen months. The Trustee, at the authorities’ request, may decide to delay the termination of the arrangement by up to three months in cases where the reaching of understandings between the authorities and the Trustee on targets and measures to put the ECF-supported program back on track within the term of the arrangement, appears imminent. The ECF arrangement will automatically terminate at the end of the extended period unless a program review under the arrangement is completed within this period. After the expiration of an ECF arrangement for a member, the cancellation of the ECF arrangement by the member, or the automatic termination of the ECF arrangement, the Trustee may approve additional ECF arrangements for an eligible member in accordance with this Instrument.

(c) Assistance under the SCF

(1) Assistance under the SCF shall be committed and made available to a qualifying member under an arrangement (hereinafter called an “SCF arrangement”) in support of a macroeconomic and structural adjustment program presented by the member. The period for an SCF arrangement shall range from one to three years. The member shall present a detailed statement of the policies and measures it intends to pursue during the first year of the arrangement, and how the program advances the member’s poverty reduction and growth objectives. In addition, the member will make an explicit statement, where applicable, about its intention to treat the SCF arrangement as precautionary. The SCF arrangement will prescribe the total amount of resources committed to the member and the phasing of disbursements during the period of the arrangement; provided that in cases where the period of a SCF arrangement exceeds one year, the arrangement may prescribe the amount to be made available during the first year of the arrangement and the phasing of disbursements during that year. Disbursements shall be phased at regular intervals no more than six months apart (one upon approval and at approximately regular intervals thereafter) with performance criteria applicable specifically to each disbursement and appropriate monitoring of key financial variables in the form of quantitative benchmarks and structural benchmarks for critical structural reforms. The SCF arrangement shall also provide for reviews by the Trustee of the member’s program scheduled at intervals that are the same as those applicable to disbursements to evaluate the macroeconomic and structural reform policies of the member and the implementation of its program and reach new understandings if necessary. In cases where the period of a SCF arrangement exceeds one year, the determination of the phasing of, and the conditions applying to, disbursements during the period of the arrangement following the first year may be made by the Trustee in the context of reviews of the program with the member. At the time of each review, the member will present a detailed statement describing progress made under the program, the policies it will follow during the next twelve months or up to the remaining period of the arrangement to further the realization of the objectives of the program, and how the program advances the country’s poverty reduction and growth objectives, with such modifications as may be necessary to assist it to achieve its objectives in changing circumstances. The member may request at any time any previously scheduled and undrawn disbursement under an SCF arrangement, provided that the most recently scheduled review under the arrangement prior to the request has been completed. After the expiration of an SCF arrangement for a member, or the cancellation of the SCF arrangement by the member, or the automatic termination of the SCF arrangement, the Trustee may approve additional SCF arrangements for that member in accordance with the Instrument provided that, normally, no SCF arrangement shall be approved that could result in a member having had SCF arrangements in place for more than three years out of any six-year period, assessed on a rolling basis. In applying this limitation, the Trustee shall not include previously approved SCF arrangements that have expired with no disbursement having taken place or new SCF arrangements whose approval the member has requested and for which the Trustee, at the time of consideration of the request, assesses that the member does not have an actual balance of payments need.

(2) Before approving a SCF arrangement, the Trustee shall be satisfied (a) that the member does not have a protracted balance of payments problem, and has an actual or potential short-term balance of payment need that is expected (or in the case of a potential balance of payments need, would be expected) to be resolved within two years and in any event not later than three years; (b) that the member’s balance of payments difficulties are not predominantly caused by a withdrawal of financial support by donors; and (c) that the member is implementing, or is committed to implement, policies aimed at resolving the balance of payments difficulties it is encountering or could encounter, and at achieving, maintaining or restoring a stable and sustainable macroeconomic position consistent with strong and durable poverty reduction.

(3) Notwithstanding subparagraph 2 above, no SCF arrangement shall be approved before January 1, 2010, based solely on the existence of a potential balance of payments need.

(4) The Trustee shall not complete the second or any subsequent review under an SCF arrangement with an initial duration exceeding two years unless it finds that: (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for an SCF arrangement or a review under an SCF arrangement. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) and shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.

(5) A member may cancel an SCF arrangement at any time by notifying the Fund of such cancellation. An SCF arrangement for a member approved after the date of adoption of this decision, which has an initial duration of more than 24 months or is extended to more than 24 months, will automatically terminate before its term if no program review under the arrangement has been completed over a period of eighteen months. The Trustee, at the authorities’ request, may decide to delay the termination of the arrangement by up to three months in cases where the reaching of understandings between the authorities and the Trustee on targets and measures to put the SCF-supported program back on track within the term of the arrangement, appears imminent. The SCF arrangement will automatically terminate at the end of the extended period unless a program review under the arrangement is completed within this period.

*******

Paragraph 2. Amount of Assistance

(a) The overall access of each eligible member to the resources of the Trust under all facilities of the Trust as specified in Section I, Paragraph 1(a) shall be subject to (i) an annual limit of 100 percent of quota; and (ii) a cumulative limit of 300 percent of quota, net of scheduled repayments. The Fund may approve access in excess of these limits in cases where the member is experiencing an exceptionally large balance of payments need, has a comparatively strong adjustment program and ability to repay the Fund, does not have sustained past access to international financial markets , and has income at or below the prevailing operational cutoff for assistance from the International Development Association (IDA); provided that access shall in no case exceed (i) a maximum annual limit of 133.33 percent of quota, and (ii) a maximum cumulative limit of 400 percent of quota, net of scheduled repayments. For the purpose of this sub-paragraph, a member is deemed to have sustained past access to international financial markets if, in addition to having income above 80 percent of the IDA operational cutoff, the public debtor has issued or guaranteed external bonds or has received disbursements under external commercial loans contracted or guaranteed by the public debtor, as defined in Executive Board Decision No. 14521-(10/3), as amended, during at least two of the past five years in a cumulative amount equivalent to at least 25 percent of the member’s quota.

(b) The access of each eligible member under the RCF shall be subject to an annual limit of 50 percent of quota, and a cumulative limit of 100 percent of quota, net of scheduled repayments, subject to the following provisions:

(i) each disbursement shall not exceed 25 percent of quota except where, the member requests assistance under the RCF to address an urgent balance of payments need resulting primarily from a sudden and exogenous shock (including a large natural disaster under (ii) below), and the member’s existing and prospective policies are sufficiently strong to address the shock;

(ii) the annual and cumulative access limits under the RCF shall be 80 percent of quota and 133.33 percent of quota , net of scheduled repayments, respectively, where (a) the member requests assistance under the RCF to address an urgent balance of payments need resulting from a natural disaster that occasions damage assessed to be equivalent to or to exceed 20 percent of the member’s gross domestic product (GDP) and (b) the member’s existing and prospective policies are sufficiently strong to address the natural disaster shock; and

(iii) Outstanding credit by a member under the rapid-access component of the ESF or outstanding purchases from the General Resources Account under emergency post conflict/natural disaster assistance covered by Decision No. 12341-(00/117), shall count towards the annual and cumulative limits applicable to access under the RCF. With effect from July 1, 2015, any purchases from the General Resources Account under the Rapid Financing Instrument shall count towards the annual and cumulative limits applicable to access under the RCF.

*******

(h) The amount of resources committed to a qualifying member under an ECF or SCF arrangement may also be increased by the Trustee in an ad-hoc review between scheduled reviews under the arrangement to address an increase in the underlying balance of payments problems of the qualifying member where the problem is so acute that the augmentation cannot await the next scheduled review under the arrangement. The Trustee, however, shall not approve requests for augmentation at an ad hoc review if the scheduled review associated with the most recent availability date preceding the augmentation request has not been completed. In support of a request for augmentation between scheduled reviews under an ECF or SCF arrangement, the member will describe in a letter of intent the nature and size of its balance of payment difficulties, and any information relevant to program implementation, including exogenous developments. Before approving such augmentation, the Trustee shall be satisfied that the program remains on track to achieve its objectives at the time of the augmentation, based on the information provided by the member, and, in particular, that the member is in compliance with any continuous performance criteria or that a waiver of nonobservance is justified and that all prior actions have been met. Requests for augmentation of access that do not exceed 15 percent of quota would be considered for approval on a lapse-of-time basis as provided for in Decision/A/13207, as amended. Following its approval by the Trustee, the augmentation of access under the arrangement will not exceed the amount immediately needed by the member in light of its balance of payments difficulties and will become available to the member in a single disbursement, which the member may request at any time until the availability date of the next scheduled disbursement under the ECF or SCF arrangement. A program review following an augmentation of access under the arrangement between scheduled reviews would be expected to include a comprehensive review of policies under the program. In order to allow the Trustee to undertake such a comprehensive assessment of the member’s policies, this review may not be completed on a lapse of time basis.

*******

Annex II. Rapid Financing Instrument—Redlined Version

*******

5. Assistance under this Decision shall be made available to members in the form of outright purchases. Access by members to resources under this Decision shall be subject to (a) an annual limit of 50 percent of quota, and (b) a cumulative limit of 100 percent of quota, net of scheduled repurchases, provided that the annual access limit shall be 80 percent of quota and the cumulative access limit shall be 133.33 percent of quota, net of scheduled repurchases, where (i) the member requests assistance under the RFI to address an urgent balance of payments need resulting from a natural disaster that occasions damage assessed to be equivalent to or to exceed 20 percent of the member’s gross domestic product (GDP), and (ii) the member’s existing and prospective policies are sufficiently strong to address the natural disaster shock.

*******

Annex III. Policy Support Instrument—Redlined Version

*******

5. Poverty Reduction Strategy (PRS) Documents. The member’s program will be based on the member’s poverty reduction strategy, which will be set forth in a Poverty Reduction and Growth Strategy (PRGS).

*******

8. (i) The implementation of the member’s program under a PSI will be assessed through program reviews, scheduled normally at regular intervals no more than six months apart. A review can be completed only if the Executive Board is satisfied that the member’s program is on track and that the conditions for the approval of a PSI, noted in paragraph 6, above, continue to be met. Having conducted, but not completed, a scheduled review, the Executive Board may subsequently return to that review, unless the previous scheduled review was not completed. Documentation supporting a return to the uncompleted review must be issued to the Executive Board prior to the earliest test date of the periodic quantitative assessment criteria linked to the next scheduled review, except for the staff report which may be issued up to one month after the earliest test date of the periodic quantitative assessment criteria linked to the next scheduled review.

(ii) The Trustee shall not complete the second or any subsequent review under a PSI with an initial duration exceeding two years unless it finds that: (A) the member concerned has a poverty reduction strategy that has been developed and made publicly available normally within the previous 5 years but no more than 6 years, and covers the period leading up to and covering the date of the completion of the relevant review; and (B) the poverty reduction strategy has been issued to the Executive Board and has been the subject of a staff analysis in the staff report on a request for a PSI or a review under a PSI. A Poverty reduction strategy issued to the Executive Board on or after May 24, 2019 shall be named Poverty Reduction and Growth Strategy (PRGS) as set forth in paragraph 5 above and a poverty reduction strategy that has been issued to the Executive Board as an Economic Development Document shall be deemed a PRGS. A PRGS shall comprise any of the following: (a) a document developed by a member country on its national development plan or strategy that is already in existence and publicly available, and documents its poverty reduction strategy; or (b) a document newly prepared by a member country documenting its poverty reduction strategy. A PRGS shall be accompanied by a cover letter from the member country concerned to the Managing Director, and shall be issued to the Executive Board with the cover letter. As such, the cover letter shall be deemed to constitute part of the PRGS.

Annex IV. Transparency Policy Decision—Redlined Version

*******

4. a. The Managing Director will not recommend that the Executive Board approve (i) an arrangement under the Poverty Reduction and Growth Trust (PRGT) or completion of a review under such arrangement, or (ii) a Heavily Indebted Poor Countries (HIPC) decision point or completion point decision, or (iii) a member’s request for a PSI or the completion of a review under a PSI, if the member concerned does not explicitly consent to the publication of its Interim Poverty Reduction Strategy Paper (I-PRSP), Poverty Reduction Strategy Paper (PRSP), PRSP preparation status report, PRSP annual progress report (APR), Economic Development Document (“EDD”) or Poverty Reduction and Growth Strategy (PRGS) (Document 10 or Document 15, as the case may be).

b. The Managing Director will generally not recommend that the Executive Board approve a request for (i) access to resources in the General Resources Account or the PRGT, or (ii) access to Fund resources under the HIPC Trust, or (iii) assistance through a PSI or a PCI, unless that member explicitly consents to the publication of the associated staff report. For purposes of this paragraph 4(b), approval of the use of the Fund’s resources includes the completion of a review under an arrangement and assistance through a PSI or a PCI includes the completion of a review under the PSI or the PCI. In the case of the PCI, where a member does not provide consent to publication of an interim performance update, the Managing Director may take this into account when determining whether to recommend that the Executive Board approve a subsequent review of the member’s PCI.

*******

11. After the Executive Board (i) adopts a decision regarding a member’s use of Fund resources (including a decision completing a review under a Fund arrangement), or (ii) adopts a decision approving a PSI or a PCI, or conducts a review under a PSI or a PCI, or (iii) completes a discussion on a member’s participation in the HIPC Initiative, or (iv) completes a discussion on a member’s I-PRSP, PRSP, PRSP preparation status report, APR, EDD or PRGS in the context of the use of Fund resources or a PSI, a Press Release, which will contain a Chairman’s statement on the discussion, emphasizing the key points made by Executive Directors, will be issued to the public. Where relevant, the Chairman’s statement will contain a summary of HIPC Initiative decisions pertaining to the member and the Executive Board’s views on the member’s I-PRSP, PRSP, PRSP preparation status report, APR, EDD or PRGS in the context of use of Fund resources or a PSI. Waivers for nonobservance, or of applicability, of performance criteria, and any other matter as may be decided by the Executive Board from time to time (Document 21), and waivers for nonobservance of assessment criteria, and any other matter as may be decided by the Executive Board from time-to-time (Document 22), will be mentioned in the factual statement section of the Press Release or in a factual statement issued in lieu of a Chairman’s statement as provided for in paragraph 13(b). Before a Press Release is issued, it will, if any Executive Director so requests, be read by the Chairman to the Executive Board and Executive Directors will have an opportunity to comment at that time. The Executive Director elected, appointed, or designated by the member concerned will have the opportunity to review the Chairman’s statement, to propose minor revisions, if any, and to consent to its publication immediately after the Executive Board meeting. Notwithstanding the above, no Press Release published under this paragraph shall contain any reference to a discussion or decision pertaining to a member’s overdue financial obligations to the Fund, where a Press Release following an Executive Board decision to limit the member’s use of Fund resources because of the overdue financial obligations has not yet been issued. In the case of an Executive Board meeting pertaining solely to a discussion or decision with respect to a member’s overdue financial obligations, no Chairman’s statement will be published.

*******

13. A brief factual statement will be issued in the circumstances and within the time frames set forth in this paragraph 13.

a. With respect to the Executive Board’s consideration of an Article IV consultation, a regional surveillance discussion, an FSSA report, a post-program monitoring, an ex post assessment or an ex post evaluation:

(i) If, after twenty-eight calendar days from the relevant Board consideration, a member does not consent to the publication of a Press Release pertaining to the Board consideration, a brief factual statement will be issued stating the fact of the Board’s -consideration of the matter.

(ii) If, after twenty-eight calendar days from the relevant Board consideration, the staff report has not been published, a brief factual statement will be issued stating the fact of the Board’s consideration of the matter and clarifying the authorities’ publication intention with respect to the staff report.

b. With respect to the Executive Board’s consideration of use of Fund resources, a PCI, or a PSI, a brief factual statement shall be issued in accordance with the following provisions:

(i) If a member does not consent to the publication of a Press Release containing a Chairman’s statement (Documents 7 and 20) under paragraph 11 where one would be applicable, or if no Chairman’s statement has been issued because a decision was taken on a lapse-of-time basis, a brief factual statement will be issued immediately after the Board consideration. The factual statement will describe the Executive Board’s decision relating to (a) that member’s use of Fund resources (including HIPC initiative decisions (Document 8), waivers (Document 21), and consideration of PRSP documents, EDDs and PRGSs (Document 10), when relevant), or (b) the approval of a PSI or a PCI for that member, or the conduct of a review under that member’s PSI or PCI (including waivers (Document 22) and consideration of PRSP documents EDDs and PRGSs (Document 15), when relevant).

(ii) With respect to the consent provisions set forth in paragraph 4(b), if, after twenty-eight calendar days from the relevant Board consideration, the staff report has not been published, a brief factual statement will be issued stating the fact of the Board’s -consideration of the matter and clarifying the authorities’ publication intention with respect to the staff report.

*******

28. Documents may be published under this decision only after their consideration by the Executive Board, except for documents that are circulated for information only including: (i) I-PRSPs, PRSPs, EDDs and PRGSs; and (ii) Reports on Observance of Standards and Codes (ROSCs) and Assessment of Financial Sector Supervision and Regulation (AFSSR) Reports. Documents covered by this paragraph may be published immediately after circulation to the Executive Board.

*******

Indicative List of Documents Covered by the Decision

(1) This list is indicative and is not intended to be exhaustive. Country Documents, Fund Policy Documents and Multi-Country Documents that may be created in between reviews of the Transparency Policy will be subject to this Decision, unless the Executive Board decides otherwise on a case-by-case basis.

(2) The publication rules applicable to Multi-Country Documents will be explained in the Secretary’s cover memorandum for the documents.

(3) Country Documents and Fund Policy Documents pertain to individual documents. Multi- Country Documents pertain to both individual documents and material sections within individual Multi-Country Documents. Material sections shall mean whole chapters or appendices.

(4) To the extent that the coverage of any document is not clear, publication of such documents will be guided by the overarching principles set forth in the preamble to the Transparency Policy Decision.

I. Country Documents

A. Surveillance and Combined Documents

1. Staff Reports for Article IV consultations and Combined Article IV consultation/Use of Fund Resources Staff Reports, Combined Article IV consultations/PSI, Combined Article IV consultations/PCI, and regional surveillance discussions.

2. Selected Issues Papers and Statistical Appendices

3. Reports on Observance of Standards and Codes (ROSCs), Financial System Stability Assessment (FSSA) Reports, and Assessment of Financial Sector Supervision and Regulation (AFSSR) Reports

4. Press Releases following Article IV consultations, regional surveillance discussions, and stand-alone Board consideration of FSSA reports

B. Use of Fund Resources Documents

5. Joint Fund/World Bank Staff Advisory Notes (JSANs) on Interim Poverty Reduction Strategy Papers (I-PRSPs), Poverty Reduction Strategy Papers (PRSPs), PRSP Preparation Status Reports, and RSP Annual Progress Reports (APRs)

6. Staff Reports for Use of Fund Resources, Post-Program Monitoring, Ex Post Assessment, and Ex Post Evaluation of exceptional access arrangements (excluding staff reports dealing solely with a member’s overdue financial obligations to the Fund)

7. Press Releases containing a Chairman’s Statement for Use of Fund Resources

8. Preliminary, decision point, and completion point documents under the Heavily Indebted Poor Countries Initiative

9. Press Releases following Executive Board discussions on post-program monitoring, ex post assessments or ex post evaluations

10. I-PRSPs, PRSPs, PRSP Preparation Status Reports, APRs, EDDs and PRGSs

11. Letters of Intent and Memoranda of Economic and Financial Policies (LOIs/MEFPs)

12. Technical Memoranda of Understanding (TMUs) with policy content

C. Staff Monitored Program (SMP) Documents

13. LOIs/MEFPs for SMPs

14. Stand-alone Staff Reports on SMPs

D. Policy Support Instrument (PSI) and Policy Coordination Instrument (PCI) Documents.

15. I-PRSPs, PRSPs, PRSP Preparation Status Reports, APRs, EDDs and PRGSs in the context of PSIs

16. Joint Fund/World Bank Staff Advisory Notes (JSANs) on I-PRSPs and PRSPs in the context of PSIs

17. Letters of Intent and Memoranda of Economic and Financial Policies (LOIs/MEFPs) for PSIs and Program Statements for PCIs

18. Technical Memoranda of Understanding (TMUs) with policy content for PSIs and PCIs

19. Staff Reports for PSIs and PCIs

20. Press Releases containing a Chairman’s Statement for PSIs and PCIs

*******

Annex V. Web Posting of PRS Documentation—Redlined Version

Web posting of Poverty Reduction Strategy Papers (PRSPs), Interim PRSPs, Annual Progress Reports of PRSPs, PRSP Preparation Status reports, Economic Development Documents and Poverty Reduction and Growth Strategies in accordance with the procedures outlined in SM/06/359 (10/25/06) shall be taken to constitute issuance of such documents to the Executive Board for the purposes of: (1) Section II, paragraph 1(b)(3) and paragraph 1(c)(4) of the Instrument to Establish the Poverty Reduction and Growth Trust, Annex to Decision No. 8759-(87/176), adopted December 18, 1987, as amended; (2) Section III, paragraph 2(c) of the Instrument to Establish a Trust for Special PRGF Operations for the Heavily Indebted Poor Countries and Interim PRGF Subsidy Operations, Annex to Decision No. 11436-(97/10), adopted February 4, 1997, as amended; and (3) paragraph 8 of the Policy Support Instrument-Framework, Decision No. 13561-(05/85), adopted October 5, 2005, as amended.

1

As is the case for ECF arrangements, the eighteen-month period will count from the date of approval of the SCF arrangement, or from the date when the Executive Board last completed a review under the SCF arrangement.

2

SCF arrangements approved after the effectiveness of this amendment would include a clause referring to the automatic termination of the arrangement.

Other Resources Citing This Publication